Realization of short term interventions on parts and posts of reduced road safety on the road from Chania to the airport
There was reconstructed part of the existing old highway, length 10.200,00m for the improvement of the geometrical elements of the road and the safe traffic flow on it.
There were also constructed flyovers on the big crossroads for the regulation of traffic low and the safe transition there.
The road was constructed having a total width of 10,00m , which consisted of two flows of traffic (one on each direction) 4,00m wide on straight line and two asphalt haunches 1,00m wide each.



