Improvement of the road network Tavronitis – Kantanos – Palaiochora, subproject 6 Kantanos Palaiochora
Α unified road part of the road Kandanos – Paleochora was initially constructed with a total length of 3.800,00m.
The road was constructed with a total width of 10m of road surface which consists of two traffic lanes one for each direction with a width of 4,00m in straight line and two shoulders paved with asphalt 1,00m wide.



